How an ADU gets built, start to finish

One crew from the first parcel lookup to the final inspection, with a clear next step at every stage.

  1. Parcel checkJurisdiction, zoning district, ADU map, flood zone, lot area and HOA documents.
  2. Site visitMeasurements, grade and slab heights, electrical panel, sewer or septic, trees and access.
  3. Design and quoteA plan that fits the setbacks and a written, itemized price.
  4. EngineeringWind design, flood elevation details and energy calculations.
  5. PermittingSubmission, review comments, HOA package if needed, approval.
  6. ConstructionFoundation, structure, roof, openings, utilities, finishes.
  7. InspectionsScheduled at each stage, with corrections handled.
  8. FinalFinal inspection and sign-off to occupy.

How long does review take around Tampa Bay?

It varies by office. St. Petersburg cites about 3 to 5 business days for plan review, as of October 2026. Tampa and Hillsborough County do not publish an ADU-specific timeline that we could confirm. Each round of comments adds time, so we aim for a complete first submission.

When will I see a price?

After the site visit and a design, and before any construction. The quote is itemized. If the visit uncovers a low slab, a weak panel or a failing septic system, you hear it then, not mid-build.

What should I gather before the visit?

  • The address, and a survey if you have one.
  • Any elevation certificate for the house.
  • Your HOA declaration and architectural guidelines, if any.
  • Who will live in the unit and a working budget.

How long will my project take overall?

It depends on the build type, the office and the parcel. A garage conversion above flood elevation in St. Petersburg is a short path. A two-story garage apartment on a flood-zone lot in an overlay district is a longer one. You get a schedule specific to your project with the quote.